Cutting SOP
- Cutting Operator Begins Cutting
- Cutting Operation
- Maintenance Events
- Lunch Break
- Cutting Operator Leaves Machine for Other Work
- Cutting Operator Shift Ends
Cutting Operator Begins Cutting
(Shift start or otherwise)
- Operator logs in to PanelComplete
- Operator assigns himself to table
- Operator assigns a helper to himself
Cutting Operation
The following are the steps necessary for KPI tracking, more detailed information can be found in Manual
- Click “Start set up this layout” to reserve layout before performing setup
- Click “Material Loaded” when operator presses button to start machine
- Click “Completed” or “Failed” when machine finishes cutting
- Click “All Parts Labeled and Unloaded” when panels are checked and labeled
Maintenance Events
(Unexpected maintenance events only)
- Click machine name
- Select Maintenance type, enter description, and click “Start new maintenance”
- Click “Completed maintenance” before resuming work
Lunch Break
- Cutting Operator clicks “Go to lunch” before leaving for lunch
- Cutting Operator clicks “Return from lunch” when he returns from lunch
Cutting Operator Leaves Machine for Other Work
- Operator un-assigns himself from table
Cutting Operator Shift Ends
- Operator logs out of PanelComplete
- This will also un-assign him from table